Skip to main content

Risks

The risks of the TARA are listed under Conception, on the tab Risks. A risk names the elements that cause it, usually threat scenarios, and records how it is treated. The concept is explained in Risk Determination and Treatment.

The Risks tab of a copy of My OEM TARA with the risks R.1 to R.3, and the element column of R.2 with Caused By TS.1 and Treated by Reduction

The table​

The table has one row per risk: Name, Title, Caused By, Base Risk and Residual Risk. Point at ? next to a column title for its explanation: the base risk is the risk level without considering any controls, the residual risk the risk level with the controls taken into account. The levels come from the method configuration; see Risk Model.

Click a row to open the risk in the element column.

Create and edit a risk​

If you can edit the repository, click + below the table to add a risk. It gets the next free name, for example R.4, and opens in the element column. You can also create a risk on Risk Treatment, by choosing a treatment for a threat scenario that has no risk yet.

In the element column:

  • Caused By: the threat scenarios, attack steps or controls that cause the risk.
  • Risk Treatment: the treatment decision, in Treated by. It is the same decision as on Risk Treatment.